
Accuenergy Acuvim II TOU Energy
Time-of-use energy and maximum demand per tariff from an Accuenergy Acuvim II power meter.
The Accuenergy Acuvim II is a power meter that splits energy over up to four tariffs (sharp, peak, valley and normal) by time of day. This Modbus RTU template reads the energy per tariff for the current and prior month and the maximum demand per tariff with its time stamp from ModbusCloud.
- Protocol
- Modbus RTU
- Connection
- RS485, 19200 baud
- Registers
- 420, read and write
- Brand
- Accuenergy
- Key readings
- Import energy per tariff · Export energy per tariff · Reactive energy per tariff · Apparent energy per tariff · Maximum power demand per tariff · Maximum current demand per tariff
- Available commands
- Preset TOU energy counters
- Compatible models
- Acuvim IIE · Accuenergy Acuvim II series meters with the TOU function
- Last updated
Registers (420)
420 read, 100 write
| Name | Unit | Access | Address (Hidden until you enter your email) | Function (hidden) | Type (hidden) |
|---|---|---|---|---|---|
| Current Month Sharp Import Energy | kWh | Read and write | 29184 | FC03 / FC16 | uint32 |
| Current Month Sharp Export Energy | kWh | Read and write | 29186 | FC03 / FC16 | uint32 |
| Current Month Sharp Import Reactive Energy | kvarh | Read and write | 29188 | FC03 / FC16 | uint32 |
| Current Month Sharp Export Reactive Energy | kvarh | Read and write | 29190 | FC03 / FC16 | uint32 |
| Current Month Sharp Apparent Energy | kVAh | Read and write | 29192 | FC03 / FC16 | uint32 |
| Current Month Peak Import Energy | kWh | Read and write | |||
| Current Month Peak Export Energy | kWh | Read and write | |||
| Current Month Peak Import Reactive Energy | kvarh | Read and write | |||
| Current Month Peak Export Reactive Energy | kvarh | Read and write | |||
| Current Month Peak Apparent Energy | kVAh | Read and write | |||
| Current Month Valley Import Energy | kWh | Read and write | |||
| Current Month Valley Export Energy | kWh | Read and write | |||
| Current Month Valley Import Reactive Energy | kvarh | Read and write | |||
| Current Month Valley Export Reactive Energy | kvarh | Read and write | |||
| Current Month Valley Apparent Energy | kVAh | Read and write | |||
| Current Month Normal Import Energy | kWh | Read and write | |||
| Current Month Normal Export Energy | kWh | Read and write | |||
| Current Month Normal Import Reactive Energy | kvarh | Read and write | |||
| Current Month Normal Export Reactive Energy | kvarh | Read and write | |||
| Current Month Normal Apparent Energy | kVAh | Read and write | |||
| Current Month Total Import Energy | kWh | Read and write | |||
| Current Month Total Export Energy | kWh | Read and write | |||
| Current Month Total Import Reactive Energy | kvarh | Read and write | |||
| Current Month Total Export Reactive Energy | kvarh | Read and write | |||
| Current Month Total Apparent Energy | kVAh | Read and write | |||
| Prior Month Sharp Import Energy | kWh | Read and write | |||
| Prior Month Sharp Export Energy | kWh | Read and write | |||
| Prior Month Sharp Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Sharp Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Sharp Apparent Energy | kVAh | Read and write | |||
| Prior Month Peak Import Energy | kWh | Read and write | |||
| Prior Month Peak Export Energy | kWh | Read and write | |||
| Prior Month Peak Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Peak Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Peak Apparent Energy | kVAh | Read and write | |||
| Prior Month Valley Import Energy | kWh | Read and write | |||
| Prior Month Valley Export Energy | kWh | Read and write | |||
| Prior Month Valley Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Valley Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Valley Apparent Energy | kVAh | Read and write | |||
| Prior Month Normal Import Energy | kWh | Read and write | |||
| Prior Month Normal Export Energy | kWh | Read and write | |||
| Prior Month Normal Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Normal Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Normal Apparent Energy | kVAh | Read and write | |||
| Prior Month Total Import Energy | kWh | Read and write | |||
| Prior Month Total Export Energy | kWh | Read and write | |||
| Prior Month Total Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Total Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Total Apparent Energy | kVAh | Read and write | |||
| Current Month Incremental Sharp Import Energy | kWh | Read and write | |||
| Current Month Incremental Sharp Export Energy | kWh | Read and write | |||
| Current Month Incremental Sharp Import Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Sharp Export Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Sharp Apparent Energy | kVAh | Read and write | |||
| Current Month Incremental Peak Import Energy | kWh | Read and write | |||
| Current Month Incremental Peak Export Energy | kWh | Read and write | |||
| Current Month Incremental Peak Import Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Peak Export Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Peak Apparent Energy | kVAh | Read and write | |||
| Current Month Incremental Valley Import Energy | kWh | Read and write | |||
| Current Month Incremental Valley Export Energy | kWh | Read and write | |||
| Current Month Incremental Valley Import Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Valley Export Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Valley Apparent Energy | kVAh | Read and write | |||
| Current Month Incremental Normal Import Energy | kWh | Read and write | |||
| Current Month Incremental Normal Export Energy | kWh | Read and write | |||
| Current Month Incremental Normal Import Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Normal Export Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Normal Apparent Energy | kVAh | Read and write | |||
| Current Month Incremental Total Import Energy | kWh | Read and write | |||
| Current Month Incremental Total Export Energy | kWh | Read and write | |||
| Current Month Incremental Total Import Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Total Export Reactive Energy | kvarh | Read and write | |||
| Current Month Incremental Total Apparent Energy | kVAh | Read and write | |||
| Prior Month Incremental Sharp Import Energy | kWh | Read and write | |||
| Prior Month Incremental Sharp Export Energy | kWh | Read and write | |||
| Prior Month Incremental Sharp Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Sharp Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Sharp Apparent Energy | kVAh | Read and write | |||
| Prior Month Incremental Peak Import Energy | kWh | Read and write | |||
| Prior Month Incremental Peak Export Energy | kWh | Read and write | |||
| Prior Month Incremental Peak Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Peak Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Peak Apparent Energy | kVAh | Read and write | |||
| Prior Month Incremental Valley Import Energy | kWh | Read and write | |||
| Prior Month Incremental Valley Export Energy | kWh | Read and write | |||
| Prior Month Incremental Valley Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Valley Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Valley Apparent Energy | kVAh | Read and write | |||
| Prior Month Incremental Normal Import Energy | kWh | Read and write | |||
| Prior Month Incremental Normal Export Energy | kWh | Read and write | |||
| Prior Month Incremental Normal Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Normal Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Normal Apparent Energy | kVAh | Read and write | |||
| Prior Month Incremental Total Import Energy | kWh | Read and write | |||
| Prior Month Incremental Total Export Energy | kWh | Read and write | |||
| Prior Month Incremental Total Import Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Total Export Reactive Energy | kvarh | Read and write | |||
| Prior Month Incremental Total Apparent Energy | kVAh | Read and write | |||
| Current Month Sharp Max Import Power Demand | Read | ||||
| Current Month Sharp Import Demand Time YY/MM | Read | ||||
| Current Month Sharp Import Demand Time DD/HH | Read | ||||
| Current Month Sharp Import Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Export Power Demand | Read | ||||
| Current Month Sharp Export Demand Time YY/MM | Read | ||||
| Current Month Sharp Export Demand Time DD/HH | Read | ||||
| Current Month Sharp Export Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Import Reactive Power Demand | Read | ||||
| Current Month Sharp Import Reactive Demand Time YY/MM | Read | ||||
| Current Month Sharp Import Reactive Demand Time DD/HH | Read | ||||
| Current Month Sharp Import Reactive Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Export Reactive Power Demand | Read | ||||
| Current Month Sharp Export Reactive Demand Time YY/MM | Read | ||||
| Current Month Sharp Export Reactive Demand Time DD/HH | Read | ||||
| Current Month Sharp Export Reactive Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Apparent Power Demand | Read | ||||
| Current Month Sharp Apparent Demand Time YY/MM | Read | ||||
| Current Month Sharp Apparent Demand Time DD/HH | Read | ||||
| Current Month Sharp Apparent Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Phase A Current Demand | Read | ||||
| Current Month Sharp Phase A Current Demand Time YY/MM | Read | ||||
| Current Month Sharp Phase A Current Demand Time DD/HH | Read | ||||
| Current Month Sharp Phase A Current Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Phase B Current Demand | Read | ||||
| Current Month Sharp Phase B Current Demand Time YY/MM | Read | ||||
| Current Month Sharp Phase B Current Demand Time DD/HH | Read | ||||
| Current Month Sharp Phase B Current Demand Time Min/Sec | Read | ||||
| Current Month Sharp Max Phase C Current Demand | Read | ||||
| Current Month Sharp Phase C Current Demand Time YY/MM | Read | ||||
| Current Month Sharp Phase C Current Demand Time DD/HH | Read | ||||
| Current Month Sharp Phase C Current Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Import Power Demand | Read | ||||
| Current Month Peak Import Demand Time YY/MM | Read | ||||
| Current Month Peak Import Demand Time DD/HH | Read | ||||
| Current Month Peak Import Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Export Power Demand | Read | ||||
| Current Month Peak Export Demand Time YY/MM | Read | ||||
| Current Month Peak Export Demand Time DD/HH | Read | ||||
| Current Month Peak Export Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Import Reactive Power Demand | Read | ||||
| Current Month Peak Import Reactive Demand Time YY/MM | Read | ||||
| Current Month Peak Import Reactive Demand Time DD/HH | Read | ||||
| Current Month Peak Import Reactive Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Export Reactive Power Demand | Read | ||||
| Current Month Peak Export Reactive Demand Time YY/MM | Read | ||||
| Current Month Peak Export Reactive Demand Time DD/HH | Read | ||||
| Current Month Peak Export Reactive Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Apparent Power Demand | Read | ||||
| Current Month Peak Apparent Demand Time YY/MM | Read | ||||
| Current Month Peak Apparent Demand Time DD/HH | Read | ||||
| Current Month Peak Apparent Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Phase A Current Demand | Read | ||||
| Current Month Peak Phase A Current Demand Time YY/MM | Read | ||||
| Current Month Peak Phase A Current Demand Time DD/HH | Read | ||||
| Current Month Peak Phase A Current Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Phase B Current Demand | Read | ||||
| Current Month Peak Phase B Current Demand Time YY/MM | Read | ||||
| Current Month Peak Phase B Current Demand Time DD/HH | Read | ||||
| Current Month Peak Phase B Current Demand Time Min/Sec | Read | ||||
| Current Month Peak Max Phase C Current Demand | Read | ||||
| Current Month Peak Phase C Current Demand Time YY/MM | Read | ||||
| Current Month Peak Phase C Current Demand Time DD/HH | Read | ||||
| Current Month Peak Phase C Current Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Import Power Demand | Read | ||||
| Current Month Valley Import Demand Time YY/MM | Read | ||||
| Current Month Valley Import Demand Time DD/HH | Read | ||||
| Current Month Valley Import Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Export Power Demand | Read | ||||
| Current Month Valley Export Demand Time YY/MM | Read | ||||
| Current Month Valley Export Demand Time DD/HH | Read | ||||
| Current Month Valley Export Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Import Reactive Power Demand | Read | ||||
| Current Month Valley Import Reactive Demand Time YY/MM | Read | ||||
| Current Month Valley Import Reactive Demand Time DD/HH | Read | ||||
| Current Month Valley Import Reactive Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Export Reactive Power Demand | Read | ||||
| Current Month Valley Export Reactive Demand Time YY/MM | Read | ||||
| Current Month Valley Export Reactive Demand Time DD/HH | Read | ||||
| Current Month Valley Export Reactive Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Apparent Power Demand | Read | ||||
| Current Month Valley Apparent Demand Time YY/MM | Read | ||||
| Current Month Valley Apparent Demand Time DD/HH | Read | ||||
| Current Month Valley Apparent Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Phase A Current Demand | Read | ||||
| Current Month Valley Phase A Current Demand Time YY/MM | Read | ||||
| Current Month Valley Phase A Current Demand Time DD/HH | Read | ||||
| Current Month Valley Phase A Current Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Phase B Current Demand | Read | ||||
| Current Month Valley Phase B Current Demand Time YY/MM | Read | ||||
| Current Month Valley Phase B Current Demand Time DD/HH | Read | ||||
| Current Month Valley Phase B Current Demand Time Min/Sec | Read | ||||
| Current Month Valley Max Phase C Current Demand | Read | ||||
| Current Month Valley Phase C Current Demand Time YY/MM | Read | ||||
| Current Month Valley Phase C Current Demand Time DD/HH | Read | ||||
| Current Month Valley Phase C Current Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Import Power Demand | Read | ||||
| Current Month Normal Import Demand Time YY/MM | Read | ||||
| Current Month Normal Import Demand Time DD/HH | Read | ||||
| Current Month Normal Import Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Export Power Demand | Read | ||||
| Current Month Normal Export Demand Time YY/MM | Read | ||||
| Current Month Normal Export Demand Time DD/HH | Read | ||||
| Current Month Normal Export Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Import Reactive Power Demand | Read | ||||
| Current Month Normal Import Reactive Demand Time YY/MM | Read | ||||
| Current Month Normal Import Reactive Demand Time DD/HH | Read | ||||
| Current Month Normal Import Reactive Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Export Reactive Power Demand | Read | ||||
| Current Month Normal Export Reactive Demand Time YY/MM | Read | ||||
| Current Month Normal Export Reactive Demand Time DD/HH | Read | ||||
| Current Month Normal Export Reactive Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Apparent Power Demand | Read | ||||
| Current Month Normal Apparent Demand Time YY/MM | Read | ||||
| Current Month Normal Apparent Demand Time DD/HH | Read | ||||
| Current Month Normal Apparent Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Phase A Current Demand | Read | ||||
| Current Month Normal Phase A Current Demand Time YY/MM | Read | ||||
| Current Month Normal Phase A Current Demand Time DD/HH | Read | ||||
| Current Month Normal Phase A Current Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Phase B Current Demand | Read | ||||
| Current Month Normal Phase B Current Demand Time YY/MM | Read | ||||
| Current Month Normal Phase B Current Demand Time DD/HH | Read | ||||
| Current Month Normal Phase B Current Demand Time Min/Sec | Read | ||||
| Current Month Normal Max Phase C Current Demand | Read | ||||
| Current Month Normal Phase C Current Demand Time YY/MM | Read | ||||
| Current Month Normal Phase C Current Demand Time DD/HH | Read | ||||
| Current Month Normal Phase C Current Demand Time Min/Sec | Read | ||||
| Current Month Total Max Import Power Demand | Read | ||||
| Current Month Total Import Demand Time YY/MM | Read | ||||
| Current Month Total Import Demand Time DD/HH | Read | ||||
| Current Month Total Import Demand Time Min/Sec | Read | ||||
| Current Month Total Max Export Power Demand | Read | ||||
| Current Month Total Export Demand Time YY/MM | Read | ||||
| Current Month Total Export Demand Time DD/HH | Read | ||||
| Current Month Total Export Demand Time Min/Sec | Read | ||||
| Current Month Total Max Import Reactive Power Demand | Read | ||||
| Current Month Total Import Reactive Demand Time YY/MM | Read | ||||
| Current Month Total Import Reactive Demand Time DD/HH | Read | ||||
| Current Month Total Import Reactive Demand Time Min/Sec | Read | ||||
| Current Month Total Max Export Reactive Power Demand | Read | ||||
| Current Month Total Export Reactive Demand Time YY/MM | Read | ||||
| Current Month Total Export Reactive Demand Time DD/HH | Read | ||||
| Current Month Total Export Reactive Demand Time Min/Sec | Read | ||||
| Current Month Total Max Apparent Power Demand | Read | ||||
| Current Month Total Apparent Demand Time YY/MM | Read | ||||
| Current Month Total Apparent Demand Time DD/HH | Read | ||||
| Current Month Total Apparent Demand Time Min/Sec | Read | ||||
| Current Month Total Max Phase A Current Demand | Read | ||||
| Current Month Total Phase A Current Demand Time YY/MM | Read | ||||
| Current Month Total Phase A Current Demand Time DD/HH | Read | ||||
| Current Month Total Phase A Current Demand Time Min/Sec | Read | ||||
| Current Month Total Max Phase B Current Demand | Read | ||||
| Current Month Total Phase B Current Demand Time YY/MM | Read | ||||
| Current Month Total Phase B Current Demand Time DD/HH | Read | ||||
| Current Month Total Phase B Current Demand Time Min/Sec | Read | ||||
| Current Month Total Max Phase C Current Demand | Read | ||||
| Current Month Total Phase C Current Demand Time YY/MM | Read | ||||
| Current Month Total Phase C Current Demand Time DD/HH | Read | ||||
| Current Month Total Phase C Current Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Import Power Demand | Read | ||||
| Prior Month Sharp Import Demand Time YY/MM | Read | ||||
| Prior Month Sharp Import Demand Time DD/HH | Read | ||||
| Prior Month Sharp Import Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Export Power Demand | Read | ||||
| Prior Month Sharp Export Demand Time YY/MM | Read | ||||
| Prior Month Sharp Export Demand Time DD/HH | Read | ||||
| Prior Month Sharp Export Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Import Reactive Power Demand | Read | ||||
| Prior Month Sharp Import Reactive Demand Time YY/MM | Read | ||||
| Prior Month Sharp Import Reactive Demand Time DD/HH | Read | ||||
| Prior Month Sharp Import Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Export Reactive Power Demand | Read | ||||
| Prior Month Sharp Export Reactive Demand Time YY/MM | Read | ||||
| Prior Month Sharp Export Reactive Demand Time DD/HH | Read | ||||
| Prior Month Sharp Export Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Apparent Power Demand | Read | ||||
| Prior Month Sharp Apparent Demand Time YY/MM | Read | ||||
| Prior Month Sharp Apparent Demand Time DD/HH | Read | ||||
| Prior Month Sharp Apparent Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Phase A Current Demand | Read | ||||
| Prior Month Sharp Phase A Current Demand Time YY/MM | Read | ||||
| Prior Month Sharp Phase A Current Demand Time DD/HH | Read | ||||
| Prior Month Sharp Phase A Current Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Phase B Current Demand | Read | ||||
| Prior Month Sharp Phase B Current Demand Time YY/MM | Read | ||||
| Prior Month Sharp Phase B Current Demand Time DD/HH | Read | ||||
| Prior Month Sharp Phase B Current Demand Time Min/Sec | Read | ||||
| Prior Month Sharp Max Phase C Current Demand | Read | ||||
| Prior Month Sharp Phase C Current Demand Time YY/MM | Read | ||||
| Prior Month Sharp Phase C Current Demand Time DD/HH | Read | ||||
| Prior Month Sharp Phase C Current Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Import Power Demand | Read | ||||
| Prior Month Peak Import Demand Time YY/MM | Read | ||||
| Prior Month Peak Import Demand Time DD/HH | Read | ||||
| Prior Month Peak Import Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Export Power Demand | Read | ||||
| Prior Month Peak Export Demand Time YY/MM | Read | ||||
| Prior Month Peak Export Demand Time DD/HH | Read | ||||
| Prior Month Peak Export Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Import Reactive Power Demand | Read | ||||
| Prior Month Peak Import Reactive Demand Time YY/MM | Read | ||||
| Prior Month Peak Import Reactive Demand Time DD/HH | Read | ||||
| Prior Month Peak Import Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Export Reactive Power Demand | Read | ||||
| Prior Month Peak Export Reactive Demand Time YY/MM | Read | ||||
| Prior Month Peak Export Reactive Demand Time DD/HH | Read | ||||
| Prior Month Peak Export Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Apparent Power Demand | Read | ||||
| Prior Month Peak Apparent Demand Time YY/MM | Read | ||||
| Prior Month Peak Apparent Demand Time DD/HH | Read | ||||
| Prior Month Peak Apparent Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Phase A Current Demand | Read | ||||
| Prior Month Peak Phase A Current Demand Time YY/MM | Read | ||||
| Prior Month Peak Phase A Current Demand Time DD/HH | Read | ||||
| Prior Month Peak Phase A Current Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Phase B Current Demand | Read | ||||
| Prior Month Peak Phase B Current Demand Time YY/MM | Read | ||||
| Prior Month Peak Phase B Current Demand Time DD/HH | Read | ||||
| Prior Month Peak Phase B Current Demand Time Min/Sec | Read | ||||
| Prior Month Peak Max Phase C Current Demand | Read | ||||
| Prior Month Peak Phase C Current Demand Time YY/MM | Read | ||||
| Prior Month Peak Phase C Current Demand Time DD/HH | Read | ||||
| Prior Month Peak Phase C Current Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Import Power Demand | Read | ||||
| Prior Month Valley Import Demand Time YY/MM | Read | ||||
| Prior Month Valley Import Demand Time DD/HH | Read | ||||
| Prior Month Valley Import Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Export Power Demand | Read | ||||
| Prior Month Valley Export Demand Time YY/MM | Read | ||||
| Prior Month Valley Export Demand Time DD/HH | Read | ||||
| Prior Month Valley Export Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Import Reactive Power Demand | Read | ||||
| Prior Month Valley Import Reactive Demand Time YY/MM | Read | ||||
| Prior Month Valley Import Reactive Demand Time DD/HH | Read | ||||
| Prior Month Valley Import Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Export Reactive Power Demand | Read | ||||
| Prior Month Valley Export Reactive Demand Time YY/MM | Read | ||||
| Prior Month Valley Export Reactive Demand Time DD/HH | Read | ||||
| Prior Month Valley Export Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Apparent Power Demand | Read | ||||
| Prior Month Valley Apparent Demand Time YY/MM | Read | ||||
| Prior Month Valley Apparent Demand Time DD/HH | Read | ||||
| Prior Month Valley Apparent Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Phase A Current Demand | Read | ||||
| Prior Month Valley Phase A Current Demand Time YY/MM | Read | ||||
| Prior Month Valley Phase A Current Demand Time DD/HH | Read | ||||
| Prior Month Valley Phase A Current Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Phase B Current Demand | Read | ||||
| Prior Month Valley Phase B Current Demand Time YY/MM | Read | ||||
| Prior Month Valley Phase B Current Demand Time DD/HH | Read | ||||
| Prior Month Valley Phase B Current Demand Time Min/Sec | Read | ||||
| Prior Month Valley Max Phase C Current Demand | Read | ||||
| Prior Month Valley Phase C Current Demand Time YY/MM | Read | ||||
| Prior Month Valley Phase C Current Demand Time DD/HH | Read | ||||
| Prior Month Valley Phase C Current Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Import Power Demand | Read | ||||
| Prior Month Normal Import Demand Time YY/MM | Read | ||||
| Prior Month Normal Import Demand Time DD/HH | Read | ||||
| Prior Month Normal Import Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Export Power Demand | Read | ||||
| Prior Month Normal Export Demand Time YY/MM | Read | ||||
| Prior Month Normal Export Demand Time DD/HH | Read | ||||
| Prior Month Normal Export Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Import Reactive Power Demand | Read | ||||
| Prior Month Normal Import Reactive Demand Time YY/MM | Read | ||||
| Prior Month Normal Import Reactive Demand Time DD/HH | Read | ||||
| Prior Month Normal Import Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Export Reactive Power Demand | Read | ||||
| Prior Month Normal Export Reactive Demand Time YY/MM | Read | ||||
| Prior Month Normal Export Reactive Demand Time DD/HH | Read | ||||
| Prior Month Normal Export Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Apparent Power Demand | Read | ||||
| Prior Month Normal Apparent Demand Time YY/MM | Read | ||||
| Prior Month Normal Apparent Demand Time DD/HH | Read | ||||
| Prior Month Normal Apparent Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Phase A Current Demand | Read | ||||
| Prior Month Normal Phase A Current Demand Time YY/MM | Read | ||||
| Prior Month Normal Phase A Current Demand Time DD/HH | Read | ||||
| Prior Month Normal Phase A Current Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Phase B Current Demand | Read | ||||
| Prior Month Normal Phase B Current Demand Time YY/MM | Read | ||||
| Prior Month Normal Phase B Current Demand Time DD/HH | Read | ||||
| Prior Month Normal Phase B Current Demand Time Min/Sec | Read | ||||
| Prior Month Normal Max Phase C Current Demand | Read | ||||
| Prior Month Normal Phase C Current Demand Time YY/MM | Read | ||||
| Prior Month Normal Phase C Current Demand Time DD/HH | Read | ||||
| Prior Month Normal Phase C Current Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Import Power Demand | Read | ||||
| Prior Month Total Import Demand Time YY/MM | Read | ||||
| Prior Month Total Import Demand Time DD/HH | Read | ||||
| Prior Month Total Import Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Export Power Demand | Read | ||||
| Prior Month Total Export Demand Time YY/MM | Read | ||||
| Prior Month Total Export Demand Time DD/HH | Read | ||||
| Prior Month Total Export Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Import Reactive Power Demand | Read | ||||
| Prior Month Total Import Reactive Demand Time YY/MM | Read | ||||
| Prior Month Total Import Reactive Demand Time DD/HH | Read | ||||
| Prior Month Total Import Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Export Reactive Power Demand | Read | ||||
| Prior Month Total Export Reactive Demand Time YY/MM | Read | ||||
| Prior Month Total Export Reactive Demand Time DD/HH | Read | ||||
| Prior Month Total Export Reactive Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Apparent Power Demand | Read | ||||
| Prior Month Total Apparent Demand Time YY/MM | Read | ||||
| Prior Month Total Apparent Demand Time DD/HH | Read | ||||
| Prior Month Total Apparent Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Phase A Current Demand | Read | ||||
| Prior Month Total Phase A Current Demand Time YY/MM | Read | ||||
| Prior Month Total Phase A Current Demand Time DD/HH | Read | ||||
| Prior Month Total Phase A Current Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Phase B Current Demand | Read | ||||
| Prior Month Total Phase B Current Demand Time YY/MM | Read | ||||
| Prior Month Total Phase B Current Demand Time DD/HH | Read | ||||
| Prior Month Total Phase B Current Demand Time Min/Sec | Read | ||||
| Prior Month Total Max Phase C Current Demand | Read | ||||
| Prior Month Total Phase C Current Demand Time YY/MM | Read | ||||
| Prior Month Total Phase C Current Demand Time DD/HH | Read | ||||
| Prior Month Total Phase C Current Demand Time Min/Sec | Read |
Loading registers…

Send your device list
If a device is not in the library yet, we build the template for free as soon as we have the register data.
Use cases
- Show this month's energy per tariff on a ModbusCloud dashboard to see how much falls in the expensive peak hours.
- Compare last month's sharp, peak, valley and normal energy for a monthly cost report.
- Track the highest demand per tariff and when it happened to spot avoidable peaks.
- Send an email alert when the monthly peak demand rises above a level you set.
- Keep a year of tariff energy history for each meter in your fleet.
Installation
Set up the TOU function on the Acuvim II: tariffs, time periods and the clock.
Connect RS485 A and B of the meter to the ModbusCloud Gateway, with 120 ohm termination at both bus ends.
In ModbusCloud, add the meter as a Modbus device with its address and speed and import this template next to the main Acuvim II template.
Check that the total tariff energy matches the meter display, then remove registers you do not need.
Things to watch for
All TOU registers read zero. What is wrong?
TOU only counts when the TOU function is enabled with tariffs and periods, and when the clock is set. Check the TOU settings on the meter or in its software, and set the clock. Meters without TOU support do not fill these registers.
The energy values are a factor 10 or 1000 off.
The meter sets the resolution of its energy values with the energy display mode (primary or secondary). Compare one tariff total with the display and set the scale in ModbusCloud to match.
How do I read the demand time stamp?
Each demand value has three time stamp words: year and month, day and hour, minute and second, with two fields in one word. Read them as numbers and split each word into its two parts.
Can I write the energy counters?
Yes, the energy counters accept writes, for example to carry over values from an old meter. A write overwrites the counter at once, so read the current value first and write only when you mean to.
Want to see how it works?











