Thytronic Thytronic SME2RU Modbus RTU template

Thytronic SME2RU

Directional earth fault and short-circuit detector with three phase CTs and wide setting ranges.

The Thytronic SME2RU is a directional earth fault and short-circuit detector for MV secondary substations that measures the phase voltages, all three phase currents and the residual current of an MV line. This Modbus RTU template reads the voltages, currents, residual voltage, fault angle and self-test, and lets you set thresholds, operate times and protection enables and send store, test and calibration commands from ModbusCloud.

Protocol
Modbus RTU
Connection
RS485, 9600 baud
Registers
56, read and write
Key readings
Phase voltages · Phase currents · Residual current · Residual voltage · Fault angle · Self-test status · Calibration result
Available commands
Earth fault thresholds · Overcurrent thresholds · Operate times · Protection enables · Store and test commands · Calibration start
Compatible models
SME2RU · SME2RUB
Last updated

Registers (56)

50 read, 25 write

NameUnitAccessAddress (Hidden until you enter your email)Function (hidden)Type (hidden)
Phase Voltage V4 (x Vn)Read
Phase Voltage V8 (x Vn)Read
Phase Voltage V12 (x Vn)Read
Phase Current I4ARead
Phase Current I8ARead
Phase Current I12ARead
Residual Current IOARead
Residual Voltage VO%Read
Residual Angle Theta°Read
Residual Current IO True RMSARead
Residual Voltage VO Average%Read
Residual Voltage Component VX%Read
Residual Voltage Component VY%Read
Voltage Angle Alfa RS°Read
Voltage Angle Alfa RT°Read
Voltage Dissymmetry°Read
Residual Current Distortion%Read
Phase Voltage V4 Uncalibrated (x Vn)Read
Phase Voltage V8 Uncalibrated (x Vn)Read
Phase Voltage V12 Uncalibrated (x Vn)Read
Direction Reversal Input (INV)Read
Self-Test LevelRead
Calibration ResultRead
Oscillography StateRead
U0> Threshold%Read and write
IED> ThresholdARead and write
67 Sector Start Angle°Read and write
67 Sector End Angle°Read and write
67 Operate TimemsRead and write
I> Threshold Multi-Phase FaultARead and write
I> Threshold Double Earth FaultARead and write
51 Operate TimemsRead and write
Voltage Presence Time (27/59)msRead and write
Fault Masking TimemsRead and write
Intermittent Fault Threshold%Read and write
Intermittent Fault Pickup DelaymsRead and write
Intermittent Fault Dropout DelaymsRead and write
Current Output Rated CurrentARead and write
Theta Correction°Read and write
Protection Enable 51/67Read and write
Settings CommandWrite
Recorded Data CommandWrite
Oscillography Retrigger CommandWrite
Board Reset CommandWrite
Test CommandWrite
Calibration Start CommandWrite
Oscillography Trigger CountRead
Oscillography Trace A -40 msRead
Oscillography TriggerRead
Calibration Report EPOT VRRead
Device IdentificationRead
System ReleaseRead
Mean Processing Cycle TimeRead
Serial Number SettingRead and write
EPOT Test ValueRead and write
Configuration SwitchesRead and write

Loading registers…

Send your device list

If a device is not in the library yet, we build the template for free as soon as we have the register data.

Number of installations (optional)

Use cases

  • Show the phase voltages, three phase currents and residual current of each secondary substation on a dashboard, with a year of history per value.
  • Send an e-mail or webhook alert when the residual current or residual voltage rises above a level you choose.
  • Get an alert when the self-test level is no longer None, so a faulty detector is replaced before the next fault.
  • Compare the three phase currents over time to spot unbalanced load on a feeder.
  • Check the thresholds and protection enables remotely and adjust them during commissioning.

Installation

  1. Connect the front RJ45 port of the SME2RU with the Thytronic SOC003 adapter to an RS232 to RS485 converter, and wire the converter to the RS485 port of the ModbusCloud Gateway (A to A, B to B).

  2. The SME2RU talks at 9600 baud, 8 data bits, no parity and 1 stop bit. Use one converter per detector and terminate the RS485 side with 120 Ω.

  3. In ModbusCloud, add a Modbus device on the RS485 port of the Gateway with address 1, 9600 baud, 8 data bits, no parity and 1 stop bit.

  4. Import the Thytronic SME2RU template and check that the phase voltages and the three phase currents come in.

  5. Compare the values with ThySetter on a PC, and start a calibration only with the line energised and no fault on the network.

Things to watch for

The Gateway gets no answer from the SME2RU. What should I check?

The SME2RU speaks Modbus on its front RJ45 port at RS232 level, so it needs the SOC003 adapter and an RS232 to RS485 converter. Check the converter wiring to A and B on the Gateway, 9600 baud without parity, and address 1. If address 1 does not answer, look up the address with ThySetter.

Why do the phase voltages show values around 1 instead of kV?

The SME2RU reports the phase voltages as a multiple of the rated voltage Vn and the residual voltage as a percentage of Vn. A value of 1.00 means rated voltage. If the three phases differ a lot with the line in service, run the calibration again with no fault on the network.

I wrote a new threshold, but it is gone after a restart. Why?

The SME2RU keeps changed settings in temporary memory until it receives the store command. After writing new values, write Store to the Settings Command register, or Clear to discard them. Read a setting first before you write it, so you know the current value.

Some values stay empty while the voltages come in. Is that normal?

Identification, system release, cycle time, self-test, calibration report and oscillography data are part of larger messages that the detector may only send as a whole. Protection Enable 51/67 only exists on version b (SME2RUB, code 32) and stays empty on version a. The voltages, currents and angle are still read as normal.

Can a test command signal a fault to the remote control unit?

Yes. The relay tests close the 51, 67 or voltage presence contact to the remote control unit, which handles it as a real signal. Only use them during commissioning or maintenance with the control room informed, and write Test off afterwards.

Want to see how it works?