Thytronic Thytronic SME3 Modbus RTU template

Thytronic SME3

Directional earth fault and short-circuit detector with event log for MV secondary substations.

The Thytronic SME3 is a directional earth fault and short-circuit detector for MV secondary substations that measures the phase voltages, phase currents and residual current of an MV line and logs faults with date and time. This Modbus RTU template reads the voltages, currents, residual voltage, fault angle, self-test and event count, and lets you set fault thresholds and operate times and send store, reset and test commands from ModbusCloud.

Protocol
Modbus RTU
Connection
RS485, 9600 baud
Registers
59, read and write
Key readings
Phase voltages · Phase currents · Residual current · Residual voltage · Fault angle · Self-test status · Stored events
Available commands
Earth fault thresholds · Overcurrent thresholds · Operate times · Event selection · Store and test commands · Calibration start
Compatible models
SME3
Last updated

Registers (59)

53 read, 25 write

NameUnitAccessAddress (Hidden until you enter your email)Function (hidden)Type (hidden)
Phase Voltage V4 (x Vn)Read
Phase Voltage V8 (x Vn)Read
Phase Voltage V12 (x Vn)Read
Phase Current I4ARead
Phase Current I12ARead
Residual Current IOARead
Residual Voltage VO%Read
Residual Angle Theta°Read
Residual Current IO True RMSARead
Residual Voltage VO Average%Read
Residual Voltage Component VX%Read
Residual Voltage Component VY%Read
Voltage Angle Alfa RS°Read
Voltage Angle Alfa RT°Read
Voltage Dissymmetry°Read
Residual Current Distortion%Read
Phase Voltage V4 Uncalibrated (x Vn)Read
Phase Voltage V8 Uncalibrated (x Vn)Read
Phase Voltage V12 Uncalibrated (x Vn)Read
Direction Reversal Input (INV)Read
Self-Test LevelRead
Calibration ResultRead
Oscillography StateRead
Events StoredRead
Selected Event NumberRead
U0> Threshold%Read and write
IED> ThresholdARead and write
67 Sector Start Angle°Read and write
67 Sector End Angle°Read and write
67 Operate TimemsRead and write
I> Threshold Multi-Phase FaultARead and write
I> Threshold Earth Fault (51N)ARead and write
51 Operate TimemsRead and write
Voltage Presence Time (27/59)msRead and write
Fault Masking TimemsRead and write
Intermittent Fault Threshold%Read and write
Intermittent Fault Pickup DelaymsRead and write
Intermittent Fault Dropout DelaymsRead and write
Current Output Rated CurrentARead and write
Theta Correction°Read and write
Event Record SelectRead and write
Settings CommandWrite
Recorded Data CommandWrite
Reset CommandWrite
Board Reset CommandWrite
Test CommandWrite
Calibration Start CommandWrite
Oscillography Trigger CountRead
Oscillography Trace A -40 msRead
Oscillography TriggerRead
Calibration Report EPOT VRRead
Clock YearRead
Device IdentificationRead
System ReleaseRead
Mean Processing Cycle TimeRead
Serial Number SettingRead and write
EPOT Test ValueRead and write
Configuration SwitchesRead and write
Set Clock YearRead

Loading registers…

Send your device list

If a device is not in the library yet, we build the template for free as soon as we have the register data.

Number of installations (optional)

Use cases

  • Show the phase voltages, phase currents and residual current of each secondary substation on a dashboard, with a year of history per value.
  • Send an alert as soon as the number of stored events changes, so every new trip or loss of voltage is reported.
  • Send an e-mail or webhook alert when the residual current or residual voltage rises above a level you choose.
  • Get an alert when the self-test level is no longer None, so a faulty detector is replaced before the next fault.
  • Check the earth fault and overcurrent thresholds remotely and adjust them during commissioning.

Installation

  1. Connect the front RJ45 port of the SME3 with the Thytronic SOC003 adapter to an RS232 to RS485 converter, and wire the converter to the RS485 port of the ModbusCloud Gateway (A to A, B to B).

  2. The SME3 talks at 9600 baud, 8 data bits, no parity and 1 stop bit. Use one converter per detector and terminate the RS485 side with 120 Ω.

  3. In ModbusCloud, add a Modbus device on the RS485 port of the Gateway with address 1, 9600 baud, 8 data bits, no parity and 1 stop bit.

  4. Import the Thytronic SME3 template and check that the phase voltages and the residual current come in.

  5. Compare the values with ThySetter on a PC, and start a calibration only with the line energised and no fault on the network.

Things to watch for

The Gateway gets no answer from the SME3. What should I check?

The SME3 speaks Modbus on its front RJ45 port at RS232 level, so it needs the SOC003 adapter and an RS232 to RS485 converter. Check the converter wiring to A and B on the Gateway, 9600 baud without parity, and address 1. If address 1 does not answer, look up the address with ThySetter.

Why do the phase voltages show values around 1 instead of kV?

The SME3 reports the phase voltages as a multiple of the rated voltage Vn and the residual voltage as a percentage of Vn. A value of 1.00 means rated voltage. If the three phases differ a lot with the line in service, run the calibration again with no fault on the network.

I wrote a new threshold, but it is gone after a restart. Why?

The SME3 keeps changed settings in temporary memory until it receives the store command. After writing new values, write Store to the Settings Command register, or Clear to discard them. Read a setting first before you write it, so you know the current value.

Some values stay empty while the voltages come in. Is that normal?

The clock, the selected event, the event count, identification, self-test, calibration report and oscillography data are part of larger messages that the detector may only send as a whole. When one of those stays empty, the voltages, currents and angle are still read as normal. Set the clock with ThySetter.

Can a test command signal a fault to the remote control unit?

Yes. The relay tests close the 51, 67 or voltage presence contact to the remote control unit, which handles it as a real signal. Only use them during commissioning or maintenance with the control room informed, and write Test off afterwards.

Want to see how it works?